咨询热线:

0531-88771136

您的当前位置: 首页 > 新闻中心 > 正文

关于beplay全站app安卓加工术语你都知道吗?

来源:http://www.jnhjgs.cn     发布时间:2020-05-26 13:43:44    点击:

  出模:啤件在顶出机构的作用下离开beplay全站app安卓的过程
  Ejection: the process of beer parts leaving the mold under the action of ejection mechanism
  啤把:出模角度或者出模斜度
  Beer handle: die angle or die inclination
  倒扣:因为侧面角度或凹位而无法垂直出模的位置
  Reverse buckle: the position where the die cannot be vertically pulled out due to the side angle or concave position
  排模:beplay全站app安卓的排期
  Die arrangement: die arrangement
  正哥:型腔在上模,型芯在下模的一种beplay全站app安卓结构
  Zhengge: a mold structure with cavity in the upper mold and core in the lower mold
  反哥:型心在上模,型腔在下模的一种beplay全站app安卓结构
  Anti Ge: a die structure with the core in the upper die and the cavity in the lower die
  分型:把产品分为上下模的过程
  Parting: the process of dividing products into upper and lower dies
  种针:基准针,配针时以此针为基准
  Seed needle: reference needle, which is used as the reference when matching needles
  放样:胶样的比例放大
  Lofting: scale up of glue samples
  复样:胶样的复制
  Duplicate sample: copy of glue sample
  调面:在雕刻时,调整胶样表面与要加工表面平行的过程
  Face adjustment: the process of adjusting the surface of the rubber sample to be parallel to the surface to be machined during engraving
  摆斜雕刻:在雕刻时,因有些面不易加工,把胶样摆成一定角度的加工方法
  Swaying carving: in carving, because some surfaces are not easy to process, the processing method of placing the rubber sample at a certain angle
  顶针出柱:用顶针的顶面来封住成型柱的底面,而使柱成型
  Ejector pin out of the column: the top of the ejector pin is used to seal the bottom of the molding column, so that the column is formed
  顶针包针:顶针过长或配针不当,而使顶针包在产品内
  Thimble wrapping: the thimble is too long or not matched properly, so that the thimble is wrapped in the product
  锅柱:柱的前端有一锥型孔,上大下小,起到铆钉的作用。多用于压铸模
  Pot column: the front end of the column has a cone-shaped hole, big up and small down, which plays the role of rivet. Mostly used in die casting die
  镶针出柱:用镶针的顶面来封住成型柱的底面,而使柱成型
  Inserting needle out of the column: the top surface of the inserting needle is used to seal the bottom surface of the forming column, so that the column is formed
  镶针出孔:用镶针成型孔
  Inserting needle hole: forming hole with inserting needle
  原身出:用内模加工出要成型的形状来成型的方法
  Original body out: the method of forming the shape to be formed by internal mold processing
  大水口:二板模
  Dashuikou: two plate mold
  入水水塘:啤件为透明件或要求变形较小的薄壁件入水时,采用在浇口与流道间所加的一段起到缓冲作用的位置方法,这个缓冲位置就是入水水塘
  Water inlet pond: when the beer parts are transparent parts or thin-walled parts with small deformation are required to enter the water, the method of adding a section between the gate and the flow channel to play a buffer role is adopted. This buffer position is the water inlet pond
  磨角尺:用磨床磨直角
  Grinding Square: grinding right angle with grinding machine
  锣正:用铣床铣平面或直角
  Gongzheng: milling plane or right angle with milling machine
  Fit平面:用打磨机把平面精加工到要求的配合公差范围
  Fit plane: finish the plane to the required fit tolerance with a grinder
  Fit枕位:用打磨机把枕位精加工到要求的配合公差范围
  Fit pillow position: finish the pillow position to the required fit tolerance with a grinder
  Fit行位:用打磨机把行位精加工到要求的配合公差范围
  Fit line position: use a grinder to finish the line position to the required fit tolerance range
  Fit插穿:用打磨机把插穿位精加工到要求的配合公差范围
  Fit insertion: finish the insertion position to the required fit tolerance with a grinder
  面镶:镶件从内模的上表面镶入一定的深度,不可到底面,下面用螺丝固定
  Face inserting: the insert is inserted into a certain depth from the upper surface of the internal mold, not to the bottom surface, and the lower part is fixed with screws
  通镶:镶件从内模的下面镶入,直达上表面,通过整个内模
  Through insert: insert from the lower part of the internal mold to the upper surface, through the entire internal mold
  兜底镶:镶件从内模的下面镶入,直达上表面,通过整个内模,在镶件下面以台阶形式固定
  Pocket bottom inlay: the inlay is inserted from the lower part of the internal mold to the upper surface, and fixed in the form of steps under the inlay through the entire internal mold
  侧镶:镶件从侧面镶入,一般多用在行位上
  Side inserts: inserts are inserted from the side, generally used on the row
  奔子孔:胶样上的一个基准孔,所有的位置都要从这个孔取数
  Runner hole: a reference hole on the rubber sample. All positions should be taken from this hole
  镗蚀:铜公水平运动加工
  Boring and eroding: horizontal movement machining of copper
  照数:用镜对要加工部位进行坐标值确定
  Number of photos: use the center mirror to determine the coordinate value of the parts to be processed
  打盲孔:用电火花加工盲孔
  Drilling blind hole: EDM blind hole
  损公:损耗的铜公
  Loss of copper
  积碳:EDM加工时产生的碳堆积在零件或铜公上,使被加工的零件的平面凹凸不平
  Carbon deposit: the carbon produced during EDM machining is accumulated on the part or copper male, making the plane of the machined part uneven
  粗公:粗加工时使用的铜公,火花间隙一般为单边0.25
  Rough male: Copper male used in rough machining, the spark gap is generally 0.25 on one side
  幼公:精加工时使用的铜公,火花间隙一般为单边0.07
  Young male: Copper male used in finishing, the spark gap is generally 0.07 on one side
  暴公:比粗公火花间隙还要大的铜公,用与粗加工
  Male: Copper male with larger spark gap than the male, used for rough machining
  立体公:一个整体铜公,形状与整个上模或这个下模相同
  Three dimensional male: a whole copper male with the same shape as the whole upper mold or the lower mold
  打字麦:打字码
  Typing wheat: Typing Code
  合模:上下模合在一起
  Mold closing: the upper and lower molds are combined
  Fit针:用打磨机对镶针或顶针进行磨削加工,使之达到合适的配合公差
  Fit needle: grinding the inserted needle or thimble with a grinder to achieve the proper fit tolerance
  配针:装配顶针的过程
  Needle matching: the process of assembling the thimble
  试运水:堵住出水口,在入水口加水并加压,看是否有漏水的情况
  Test run water: plug the water outlet, add water and pressurize the water inlet to see if there is water leakage
  配压座:对压座进行加工,使之与行位配合
  Pressure seat: process the pressure seat to make it fit with the running position
  配行位:对行位进行加工,使之与压条配合的过程
  Alignment: the process of machining the alignment to fit the bead
  锁模片:装在外面,把上下模固定在一起的铁片
  Die locking plate: iron plate installed outside and fixing the upper and lower dies together
  扣机:有尼龙扣机与机械扣机之分,主要用在三板模,起到控制开模顺序的作用
  Buckle machine: divided into nylon buckle machine and mechanical buckle machine, it is mainly used in three plate mold to control the opening sequence
  回针件:预复位机构,用于保护顶针,在顶针与行位或上模有干涉时使用
  Needle return part: pre reset mechanism, used to protect the thimble, when the thimble interferes with the running position or upper die
  外置弹弓:暴露在外面可已看得到的弹弓
  External slingshot: visible slingshot when exposed
  波子弹弓:内置弹弓
  Wave slingshot: built-in slingshot
  片弹弓:碟型弹弓
  Catapult: disc type catapult
  转水口:可以控制控制入水方向的一种入水装置
  Water inlet: a water inlet device that can control the water inlet direction
  导边:导柱
  Guide edge: guide post
  斜导边:斜导柱
  Skew guide edge: skew guide pillar
  导套:与导柱配合的套
  Guide sleeve: the sleeve matching with the guide pillar
  导柱排气:避免导套内产生真空,在导套的顶面开的一个排气槽
  Guide pillar exhaust: to avoid vacuum in the guide sleeve, an exhaust slot is opened on the top surface of the guide sleeve
  基准角:beplay全站app安卓上两条基准边的夹角
  Reference angle: the angle between two reference edges on the mold
  撬模槽:在模框的四个角开的槽
  Pry mold groove: groove at four corners of mold frame
  顶棍:在啤机上顶出装置
  Ejector: ejector on beer machine
  炮筒:啤机的料筒
  Barrel: the barrel of a beer machine
  炮头:啤机的注射头
  Gun head: injection head of beer machine
  码仔:压板和T型块
  Size: platen and T-block
  顶白:啤件外表面被顶针顶出白色痕迹
  Top White: white mark on the external surface of beer piece pushed out by top needle
  顶翻:由于顶针不平衡,顶出时啤件的顶出高度不同
  Overturning: due to the imbalance of the ejector pin, the ejecting height of the beer parts is different when ejecting
  顶高:因扣下模而使顶针把啤件局部顶变形
  Top height: the local top deformation of the ejector pin handle beer parts due to the mold being buckled down
  困气:因排气不好致使模内产生真空而无法进料
  Trapped gas: due to poor exhaust, vacuum is generated in the mold and feeding is not possible
  夹水:溶接痕
  Water inclusion: fusion mark
  流纹:由于温度或压力不够在产品表面可以看到的溶料流动的痕迹
  Flow pattern: marks of solution flow visible on the product surface due to insufficient temperature or pressure
  气泡:由于排气不良,而在啤件上产生凹坑
  Bubble: pit on beer due to poor exhaust
  变形:由于内应力导致啤件的形状与尺寸发生变化
  Deformation: the shape and size of beer parts change due to internal stress
  蛇纹:与流纹类似
  Snake pattern: similar to flow pattern
  涨模:扣模
  Expanding mold: buckle mold
  飞料:有料飞出beplay全站app安卓
  Flying material: flying material out of the mold
  披锋:在分型面上有少量的料溢出
  Phifeng: a small amount of material overflows on the parting surface
  吊针:由于壁厚不均匀而产生缩水时,在不均匀的位置加一跟针,使壁厚变的均匀
  Broach: when shrinkage occurs due to uneven wall thickness, add a needle at the uneven position to make the wall thickness uniform
  吊孔:由于吊针形成的孔
  Eyelet: a hole formed by a broach
  拖花:因为出模角度不够而出模时内模把啤件刮伤
  Drag: the internal mold scrapes the beer part when the mold is out due to the insufficient angle of the mold
  走料不齐:走料不均匀,啤件没有均匀充满
  Uneven feeding: uneven feeding, uneven beer filling
  圆口:抛光时因方法不当而使利角产生了倒圆角的现象
  Round mouth: the phenomenon of fillet caused by improper polishing method
  夹口:因上下模错位而产生
  Clamping mouth: caused by dislocation of upper and lower dies
  省大肚:抛光时加工过量而使内模表面产生凹坑
  Save big belly: the surface of the internal mold is concave due to excessive processing during polishing
  过油石:用油石加工
  Oilstone: processed with oilstone
  打石膏钻:抛光时用的一种膏,涂在要加工零件的表面
  Gypsum drill: a paste used for polishing, applied to the surface of the parts to be processed
 
  啤办:产品
  Beer office: products
  装办:对啤件进行装配
  Assembly: assembly of beer parts
  交办:把试啤好的啤件交给客户检验
  Delivery: deliver the beer sample to the customer for inspection
  放模:把加工好的beplay全站app安卓交给客户
  Setting out: give the processed mold to the customer
  试产:客户对新模进行试生产的过程
  Trial production: the process of trial production of new mould by customers
  碰穿:两个面的正面相接触,使料无法进入,而形成的无料区
  Collision and penetration: a material free area formed when the positive surfaces of two surfaces contact each other so that materials cannot enter
  插穿:两个面的侧面相接触,使料无法进入,而形成的无料区
  Interpenetration: a material free area formed by two sides contacting each other so that materials cannot enter
  枕穿:两个枕位面相接触,使料无法进入,而形成的无料区
  Pillow wear: a material free area formed by two pillow positions contacting each other so that materials cannot enter
  造型:用三维绘图软件对产品进行仿真绘制
  Modeling: simulation drawing of products with 3D drawing software
  装配:用三维绘图软件把绘制好的三维零件组合在一起的过程
  Assembly: the process of combining drawn 3D parts with 3D drawing software
  运动模拟:用三维绘图软件对产品的运动进行模拟的过程
  Motion simulation: the process of simulating the motion of products with 3D drawing software
  分模:确定分型面的过程
  Parting: process of determining parting surface
  拆铜公:使用三维绘图软件对内模或行位上需要用EDM加工的位置进行CUT操作,得到一个与内模相反的三维零件
  Copper removal: use 3D drawing software to cut the position on the internal mold or row position that needs to be processed by EDM to get a 3D part opposite to the internal mold
  碰数图:EDM打铜公时用的确定坐标的图纸
  Collision number diagram: the drawing used to determine the coordinates when EDM is used to punch copper
  排位:在模图上合理的布置啤件与顶针的位置
  Arrangement: reasonably arrange the position of beer parts and thimbles on the mould drawing
  定料:根据设计好的模图订购模坯和零件的过程
  Ordering: the process of ordering blanks and parts according to the designed die drawing
  打孔图:确定beplay全站app安卓上所要加工的孔的坐标的图纸
  Hole drawing: a drawing that determines the coordinates of the holes to be machined on the mold
  分型资料:确定好产品的分型面,入水,顶出及行位的资料
  Classification data: determine the classification surface, water entry, ejection and row data of products
  手办:手工制做的样板
  Handmade: Handmade model
  啤件:产品
  Beer: products
  水口:浇口
  Gate: Gate
  以上是关于beplay全站app安卓加工术语的介绍,本文由山东beplay全站app安卓友情提供,想了解更多beplay全站app安卓制作请点击官网http://www.jnhjgs.cn
  The above is about the introduction of mold processing terms. This article is provided by Shandong mold friendship. To learn more about mold production, please click the official website http://www.jnhjgs.cn 。
联系我们 contact

山东济南beplay全站app安卓_铝合金压铸厂-济南宏捷beplay全站app安卓有限公司

电话1:13173017488

电话2:18615459955

传真:0531-88771136

邮箱:hlm369@126.com

地址:山东省济南市大桥镇大王村北跨商务中心后三层白楼

山东济南beplay全站app安卓_铝合金压铸厂-济南宏捷beplay全站app安卓有限公司 手机: 13173017488 咨询热线: 0531-88771136 咨询热线:18615459955 邮箱:hlm369@126.com

公司地址: 山东省济南市大桥镇大王村北跨商务中心后三层白楼